Posted: October 23, 2020
REGISTER FOR PROJECT EMAIL UPDATES! FOLLOW THE PROJECT ON FACEBOOK!
I39 1.6 MAS Mac OS X 3 MB. Simple and easy to use tool to create ringtones and alert tones of any music on your Mac i39 can easily create uniqu.
- The Earthquake Event Page application supports most recent browsers, view supported browsers.Or, try our Real-time Notifications, Feeds, and Web Services.
- 3 reviews of I39 SUPPLY 'I love dealing with Matt and the rest of the employees. I have purchased two trailers from them and will do all of my business worth than and recommend them to everyone that I talk to looking for trailers.
VIEW THE CONSTRUCTION FORECAST GRAPHIC!
All lane restrictions, road and ramp closures, and work operations are weather dependent and subject to change.
Two lanes remain open to traffic on I-39/90 (in each direction) during daytime hours and weekends. Access remains open to area businesses in the project area. Please continue to patronize the area businesses!
NOTE: Next week Monday through Friday, nightly single lane closures (8 p.m. – 5 a.m.) are planned on I-39/90 northbound and southbound in the following work zones, unless noted otherwise. Minor delays may occur during these lane closures.
NOTE: Only CLOSEDroads are listed below; if a road is not listed, the road is OPEN.
MADISON
I-39/90 and US 12/18 (Beltline) interchange area
County AB/Buckeye Road to south of the Beltline Interchange
Femrite Drive underpass
Anticipated construction completion: Fall 2021
County AB/Buckeye Road to south of the Beltline Interchange
Femrite Drive underpass
Anticipated construction completion: Fall 2021
- I-39/90 traffic located on existing lanes through the Beltline interchange (Exit 142 A-B).
- I-39/90 southbound traffic shifted to the median between Buckeye Road/County AB and the Beltline interchange.
- Be alert for lane shifts and reduced speed limit through this area.
- One lane CLOSEDon westbound US 12/18 from Millpond Road to the I-39/90 southbound loop ramp.
- LONG-TERM CLOSURES: The two Beltline interchange loop ramps are CLOSED until TONIGHT (Oct. 23) – weather-permitting.
- I-39/90 southbound exit loop ramp (Exit 142B)to eastbound US 12/18.
- Westbound US 12/18 loop ramp (Exit 267A) to I-39/90 southbound.
- Drivers should follow the signed detour route.
- Nightly lane closures on I-39/90 northbound and southbound in the Beltline interchange area.
- 8 p.m. to 5 a.m. Monday through Thursday (Oct. 26-29)
- 10 p.m. to 7 a.m. Friday (Oct. 30)
- Be alert for crews and equipment in the area.
- Nightly lane closure on the eastbound US 12/18 ramp to I-39/90 northbound.
- 8 p.m. to 5 a.m. Monday through Thursday (Oct. 26-29
- 10 p.m. to 7 a.m. Friday (Oct. 30)
- Be alert for crews and equipment in the area.
- Nighttime lane closure on eastbound US 12/18 in the Beltline interchange.
- 8 p.m. to 5 a.m. Monday through Thursday (Oct. 26-29)
- 10 p.m. to 7 a.m. Friday (Oct. 30)
- US 12/18 eastbound, under the I-39/90 northbound and southbound bridges, will shift back to its original lanes TONIGHT (Oct. 23) – weather-permitting
- I-39/90 northbound exit ramp (Exit 142A) CLOSED to westbound US 12/18 (Beltline).
- 9 p.m. to 5 a.m. Tuesday through Thursday nights (Oct. 27-29)
- Drivers should follow the signed detour route.
- Femrite Drive CLOSEDunder I-39/90 in Madison.
- 9 a.m. to 6 p.m. Saturday (Oct. 23)
- 6 a.m. to 6 p.m. Tuesday (Oct. 27) – weather-permitting and back-up date is Wednesday (Oct. 28).
- I-39/90 and Beltline interchange construction operations:
- Work continues on the new northbound I-39/90 bridge over Femrite Drive.
- Construction continues on the new northbound I-39/90 bridge over the I-39/90 northbound ramp to westbound US 12/18 (Beltline).
- Sign structure work along southbound I-39/90 between the railroad bridge south of Buckeye Road and Femrite Drive.
- Bridge widenings to continue on existing I-39/90 northbound and southbound structures over Femrite Drive.
- Be alert for crews and equipment in the area. Flagging operations will be used on Femrite Drive as needed.
- Bridge deck pour scheduled for Tuesday (Oct. 27) for the I-39/90 northbound bridge at Femrite Drive.
- Grading operations are ongoing inside the interchange.
- Retaining wall construction to continue along the new northbound lanes, south of eastbound US 12/18.
- Nighttime grading and paving in the eastbound US 12/18 ramp to I-39/90 northbound shoulder widenings.
County AB to US 12/18 (Beltline) interchange
Siggelkow Road underpass
Anticipated construction completion: November 2020
Siggelkow Road underpass
Anticipated construction completion: November 2020
- I-39/90 traffic is shifted onto their respective sides between the US 12/18 (Beltline) interchange and County AB near McFarland.
- Be alert for new traffic patterns.
- Eastbound US 12/18 (Beltline) ramp CLOSED to I-39/90 southbound.
- 10 p.m. to 5 a.m. Thursday night (Oct. 29)
- Back-up date is Friday night (Oct. 30)
- Drivers must use alternate routes.
- I-39/90 construction activities include:
- I-39/90 northbound traffic shifted onto new concrete pavement.
- Permanent pavement marking along the I-39/90 southbound lanes. Remove temporary barrier wall along I-39/90 southbound.
- Install permanent median concrete barrier wall along I-39/90 northbound and southbound at the north end of the project area.
- Remove temporary asphalt shoulders used for bi-directional traffic.
JANESVILLE
Kennedy Road to Rock River bridges, Janesville to Edgerton
Townline Road, County M and Newville Road underpasses
Anticipated construction completion: November 2020 Internet status 4 9 0.
Townline Road, County M and Newville Road underpasses
Anticipated construction completion: November 2020 Internet status 4 9 0.
I39 1 6 Math
- I-39/90 traffic is located on their respective sides between Townline Road and the Rock River bridges.
- On Friday (Oct. 30), three lanes are anticipated to open in each direction within these limits (weather-permitting).
- Access remains OPEN to the Janesville rest area.
- All I-39/90 traffic located on the northbound side between Townline Road and the WIS 26 interchange (Exit 171A).
- I-39/90 construction operations between Janesville and Edgerton.
- Beam guard installation, signage installation and removal of temporary pavement markings and placement of permanent markings.
WIS 26/Milton Avenue and US 14/Humes Road interchanges, Janesville
Anticipated construction completion: Fall 2021
Anticipated construction completion: Fall 2021
I39 1 6 M =
- All I-39/90 traffic is located on the newly expanded northbound Interstate lanes between the US 14/Humes Road and WIS 26/Milton Avenue interchanges.
- Follow the overhead signage and enter the lane system prior to the US 14 interchange for Exits 171 A-B.Watch the navigation video.
- LONG-TERM RAMP CLOSURE: WIS 26/Milton Avenue ramp to I-39/90 southbound CLOSEDuntil late August 2021.
- Drivers must use the US 14/Humes Road ramp to access the southbound Interstate.
- US 14/Humes Road CLOSED at I-39/90 to remove the old southbound Interstate bridge.
- 7 p.m. to 7 a.m. Monday night (Oct. 26)
- No left turns will be permitted from the I-39/90 exit ramps to US 14 (Exit 171B) to travel under the bridge.
- Drivers must use alternate routes, such as Deerfield Drive and WIS 26.
- I-39/90 construction activities at the WIS 26/Milton Avenue and US 14/Humes Road interchanges.
- The Ice Age Trail under I-39/90, adjacent to Kennedy Road, is CLOSED until early summer 2021.
- Crews will continue grading work and stone placement in the I-39/90 southbound lanes next week.
- Crews will continue work on Deerfield Drive at Ryan Road next week. Work includes traffic signals and landscaping.
- Concrete crews will place permanent barrier wall on I-39/90 mainline median next week, north of Kennedy Road.
- Storm sewer installation continues on I-39/90 mainline and Ryan Road next week.
- MSE wall construction will continue next week for the I-39/90 southbound structure over WIS 26 and Ryan Road.
- Southbound bridge construction will continue on Ryan Road next week. Bridge decking will continue through next week.
- Southbound bridge construction will continue on the WIS 26 overpass next week. Crews will work to construct the bridge abutments.
- The removal of the I-39/90 southbound structure over Kennedy Road is complete. Excavation and piling will start next week.
- The removal of the southbound Interstate structure over US 14 started this week and will finish on Monday night (Oct. 26).
BELOIT
I39 1 6 Mm
Firefox 72 01. Beloit Rest (rest area 22), north of the Illinois state line
Anticipated construction completion: Late October 2020
Anticipated construction completion: Late October 2020
- The Beloit Rest Area/Wisconsin Welcome Center is CLOSEDuntil Wednesday (Oct. 28) – weather-permitting.
- Access at the I-43/WIS 81 interchange (Exit 185) remains OPEN to area restaurants, gas stations and lodging.
- The La Prairie Safety Weight Enforcement Facility (SWEF), north of the County S/Shopiere Road interchange (Exit 183), remains OPEN.
- Read the remaining rest area operations.
- Installation of pavement markings.
I-39/90 expansion and I-43 reconstruction (Illinois state line to Hart Road; County X/Hart Road to Freeman Parkway), Beloit
Anticipated construction completion: Fall 2021
Anticipated construction completion: Fall 2021
I39 1 6 Mile
- TRAFFIC ALERT: I-43 southboundCLOSED and detoured west of the I-39/90 interchange in Beloit.
- 7 p.m. to 6 a.m. Tuesday night through Thursday night (Oct. 27-29)
- Signed detour route: I-43 southbound traffic exits at County X/Hart Road (Exit 2) and travels on County X to Gateway Blvd. then IL-75 to merge onto I-39/90 northbound.
- All I-39/90 and I-43 interchange ramps/turn movements will remain OPEN.
- I-39/90 traffic located on new northbound concrete pavement between the Hart Road and Cranston Road overpasses.
- Access from I-43/WIS 81 ramp to the southbound Interstate on existing loop ramp.
- Access remains OPEN to local businesses.
- I-43 traffic is located on the new WIS 81 lanes between I-39/90 and Gateway Blvd.
- One lane remains OPENeach way. Watch for lane shifts and crossovers.
- Be alert for construction equipment as bridge construction is taking place within the interchange area.
- I-39/90 traffic must use Exit 185 to access I-43 or WIS 81/Milwaukee Road (view the navigation map).
- I-39/90 and I-43 construction operations near Beloit:
- Structure construction ongoing of the new interchange bridges. Steel girder erection will continue through October. Watch for ramp and lane closures.
- Work to continue along the old I-39/90 southbound lanes from Hart Road to Colley Road.
- Concrete pavement will continue for the new I-39/90 lanes.